SACRAMENTO MUNICIPAL UTILTY DISTRICT

PROJECT PROFILE:

Removal and Disposal of Sediment from the Rancho Seco Park Oxidation Pond



JND used a submersible hydraulic pump and a 60ft long reach excavator to remove 600 wet tons of biosolids from a pond. The biosolids were subsequently loaded, hauled offsite and disposed of at permitted site.
=)