CITY OF FALLBROOK

PROJECT PROFILE:

Secondary Effluent Basin Cleanout


JND dredged & dewatered biosolids using centrifuges.  Vegetation was removed using a long reach excavator.  The vegetation and dewatered biosolids were then loaded into trucks and hauled to onsite basins.
=)