WESTLAND WATER DISTRICT
PROJECT PROFILE:
Forebay Dredging
JND Dredged a forebay for the intake pumps for Westlands Water District. The pumps send water to over 600,000 acres of farmland, and is part of the federally controlled Central Valley Project. Sedimentation was pumped to an onsite basin constructed by the owner.