TOWN OF HILTON HEAD
PROJECT PROFILE:
Lake Dredge and Dewater
![]() |
![]() |
Over time, the lake had become clogged with sediment and vegetation losing its natural storage capacity.
JND Thomas Company, Inc. (JND) was selected by the Town of Hilton Head Island .
The project consists of dredging and mechanical dewatering 16,554 instu cubic yards of material.
Relevant Project Elements
- Hydraulic Maintenance Dredging at a prestigious gated community/golfcourse
- Operating within an extremely environmentally sensitive area.
- Mobilization and Demobilization of a Mobile Multi Component Dewatering Plant
- Continuous Operation of Multiple Engine Driven components within minimum “Noise”
levels
- Return Water from Dewatering Operations Averaged 19ml per Liter